Products

Integrally Geared Turbo Blower

Everest Blowers proudly announces, we have received an order for Supply of Integrally Geared Turbo Blower from one of the top PSU - EPC companies for installation in FGD process of Central Govt. owned 2 x 500 MW Thermal Power Plant.

The blower specs at Design Point are:

  • Capacity: 9170 Nm3/hr
  • Differential Pressure: 9350 mmWc

forum
refresh